The way of cooperation between government and social
capital is widely used in the field of infrastructure construction. According
to relevant data, the social capital participating in PPP (Public Private
Partnership) project
is divided into three categories, and the strengths and weaknesses are
analyzed; the evaluation index system of social capital is constructed from
four aspects of financial ability, technical ability, management ability and
historical project evaluation, and the selection evaluation model is
constructed based on fuzzy comprehensive evaluation method; finally, taking a
wastewater treatment plant PPP project as an example, the model is proved to be
scientific and reasonable, and provides a new way for the government to choose
social capital.
Cite this paper
Shi, Y. and Song, P. (2018). Research on Social Capital Selection of Public-Private-Partnership Project. Open Access Library Journal, 5, e4652. doi: http://dx.doi.org/10.4236/oalib.1104652.
Zhang, X.Q. (2009) Best Value Concessionaire Selection through a Fuzzy Logic System. Expert Systems with Applications, 36, 227-254. https://doi.org/10.1016/j.eswa.2008.09.039
Wu, Q. and Gao, Y.N. (2012) Selection Model of Concessionaire in PPP Projects. Applied Mechanics and Materials, 180, 108-130. https://doi.org/10.4028/www.scientific.net/AMM.174-177.2906
El-Mashaleh, M.S. and Edward, R.M. (2013) Concessionaire Selection Model Based on Data Envelopment Analysis. Journal of Management in Engineering, 131, 484-494.
Ren, Z.T. (2016) The Selection Model of Private Sector of PPP Project Based on Grey Re-lational Degree. Journal of Tianjin University of Urban Construction, 12, 444-449.